PROJECT | FILE NUMBER | COMMENTS | YEAR | FROM TABLE | FILEPATH |
---|---|---|---|---|---|
SUBSTATION 7 | ED-027 | DIAGRAM | ELECTRIC | HTML Link | |
SUBSTATION 1 TRANSFORMERS | ED-028 | ELECTRIC | HTML Link | ||
PG&E DISPERSED GENERATING | ED-029 | 2003-01-03 | ELECTRIC | HTML Link | |
PG&E DISPERSED GENERATING | ED-030 | 2001-01-01 | ELECTRIC | HTML Link | |
SUBSTATION 5 AND 7 | ED-031 | 1993-03-25 | ELECTRIC | HTML Link | |
AMP-OHIO | ED-032 | DIAGRAM | 2000-08-28 | ELECTRIC | HTML Link |
PG&E | ED-033 | WIRING DIAGRAM | 2000-06-28 | ELECTRIC | HTML Link |
PG&E DISPERSED GENERATING | ED-034 | 2000-07-26 | ELECTRIC | HTML Link | |
PEAKER PROJECT | ED-035 |
NORTH COLLEGE PEAKING |
2000-02-16 | ELECTRIC | HTML Link |
PG&E DISPERSED GENERATING | ED-036 | 2000-04-27 | ELECTRIC | HTML Link | |
SUBSTATION 7 | ED-037 | 1998-10-26 | ELECTRIC | HTML Link | |
SUBSTATION 7 | ED-038 | PT DRAWINGS PANEL | 1998-10-30 | ELECTRIC | HTML Link |
SUBSTATION 3 | ED-039 | 2011-08-25 | ELECTRIC | HTML Link | |
RMVAC CONNECTION DIAGRAM | ED-040 | 2009-01-29 | ELECTRIC | HTML Link | |
BREAKER RACKING | ED-041 | FINAL ASSEMBLY | 2005-01-31 | ELECTRIC | HTML Link |
CENTER BREAK SWITCH | ED-042 | ASSEMBLY DRAWINGS | 2009-02-03 | ELECTRIC | HTML Link |
MODEL A12B | ED-043 | SCHEMATIC DIAGRAM | 1999-01-13 | ELECTRIC | HTML Link |
BREAKER RELAY PANEL | ED-045 | SUBSTATION 3 | 1997-08-14 | ELECTRIC | HTML Link |
SUBSTATION 3 | ED-046 | WIRING DETAILS | 2007-12-24 | ELECTRIC | HTML Link |
SUBSTATION 3 | ED-047 | WIRING DETAIL | ELECTRIC | HTML Link | |
SUBSTATION 3 | ED-048 | 2001-08-11 | ELECTRIC | HTML Link | |
CENTRAL ELECTRIC CO | ED-049 | 1997-08-01 | ELECTRIC | HTML Link | |
RMVAC CONNECTION | ED-050 | DIAGRAM | 2009-01-29 | ELECTRIC | HTML Link |
SIEMENS SHOP DRAWINGS | ED-044 | SCHEMATICS | 2003-08-08 | ELECTRIC | HTML Link |
SUBSTATION 2&3 | ED-051 | ELECTRIC | HTML Link | ||
SUBSTATION 2 | ED-052 | ANNUNCIATOR | 2007-10-04 | ELECTRIC | HTML Link |
SUBSTATION 2 | ED-053 | POE | 1997-08-14 | ELECTRIC | HTML Link |
SUBSTATION 2 | ED-054 | 1995-05-16 | ELECTRIC | HTML Link | |
SUBSTATION 2 | ED-055 | 2008-02-12 | ELECTRIC | HTML Link | |
SUBSTATION 2 | ED-056 | 1995-05-16 | ELECTRIC | HTML Link | |
SUBSTATION 2 | ED-057 | CONTROL HOUSE EQUIPMENT | 1992-11-24 | ELECTRIC | HTML Link |
WASTEWATER TREATMENT PLANT | ED-058 | 1979-03-30 | ELECTRIC | HTML Link | |
BREAKER FAILURES | ED-059 | 2003-10-30 | ELECTRIC | HTML Link | |
CIRCUIT BREAKER 6845 | ED-060 | 2003-10-28 | ELECTRIC | HTML Link | |
PT DRAWINGS | ED-061 | 2008-02-21 | ELECTRIC | HTML Link | |
CIRCUIT BREAKER 6848 | ED-062 | SUBSTATION 4 | 1997-08-14 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-063 | RELAY PANEL | 2003-10-27 | ELECTRIC | HTML Link |
S&C CIRCUIT SWITCHER | ED-064 | MODEL 2020 | 1996-07-25 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-065 | DUNBRIDGE ROAD | ELECTRIC | HTML Link | |
SUBSTATION 4 | ED-066 | 69 KV CONTROL PANEL | 1997-05-06 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-067 | 2003-10-31 | ELECTRIC | HTML Link | |
SUBSTATION 4&5 | ED-068 | REPAIRS | 1999-08-02 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-069 | SITE PLAN | 1991-09-11 | ELECTRIC | HTML Link |
ONE LINE KV 69 | ED-053 | 2008-05-28 | ELECTRIC | HTML Link | |
SOLAR SITE PACK 1 | ED-070 | NEWTON ROAD | 2016-07-07 | ELECTRIC | HTML Link |
SOLAR SITE PACK 2 | ED-071 | NEWTON ROAD | 2016-04-25 | ELECTRIC | HTML Link |
SOLAR SITE PACK 3 | ED-072 | NEWTON ROAD | 2016-06-17 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-073 | SIEMENS-ALLIS SCHEMATICS | 1980-06-30 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-074 | DUNBRIDGE ROAD | 2012-11-12 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-075 | GRID AND GROUND | 1975-05-01 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-076 | ELECTRIC WASTE WATER PLANT | 1979-03-30 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-077 | SUPPLEMENTAL RESERVE GENERATION | 1973-07-01 | ELECTRIC | HTML Link |
SUBSTATION 4 | ED-078 | GENERATOR A.C. SCHEMATIC AS BUILT | 1993-08-27 | ELECTRIC | HTML Link |
UNDERGROUND DUCT SYSTEMS AND INSTALL OF 69KV AND 1 | M2-07 | 2016-06-16 | ELECTRIC | HTML Link | |
NORTH MAIN STREET ELECTRIC UTILITY RELOCATION 2010 | M2-08 | 2010-10-21 | ELECTRIC | HTML Link | |
PUBLIC WORKS | NOT FILED | 1978-08-03 | ELECTRIC | HTML Link | |
SUBSTATION NO 4 TRANSFORMER NO 8 REPLACEMENT | M3-06 | 2019-02-18 | ELECTRIC | HTML Link | |
DUNBRIDGE RD SPILL COINTAINMENT | M3-14 | ELECTRIC | HTML Link | ||
DUNBRIDGE NAPOLEON INTERSECTION | FS-1 | 2006-09-02 | FIELDSHEET | HTML Link | |
GROVE STREET FIBER | FS-2 | KDL WINDSTREAM PROJECT | 2009-12-17 | FIELDSHEET | HTML Link |
SOLAR FIELD TRANSMISSION | FS-03 | AS BUILT | 2016-07-01 | FIELDSHEET | HTML Link |
ACD.NET ALL PHASES | FS-04 | FIBER FOR MICRO CELL AERIAL AND UNDERGROUND | 2015-10-28 | FIELDSHEET | HTML Link |
WOOD COUNTY HOSPITAL STUDENT HEALTH CENTER | FS-05 | FALCON HEALTH CENTER | 2014-01-13 | FIELDSHEET | HTML Link |
SEWER DISTRICT ATLAS | FS-06 | FIELDSHEET | HTML Link | ||
STREAM AND DRAINAGE ATLAS | FS-07 | NO DATE | FIELDSHEET | HTML Link | |
MORTON MEEKER ASBUILT | FS-08 | Hand notes from crew building line - Water Sewer Department. Water and Sewer Lines | 2018-10-16 | FIELDSHEET | HTML Link |
ROSALIND DONBAR SEWER AS-BUILT | FS-09 | Hand notes from crew building line - Sewer Department. Sewer Lines - Travis Farabee | 2019-01-01 | FIELDSHEET | HTML Link |
Columbia Gas Replacement 2019 | FS-10 | E. Wooster, College, Biddle, State, Clough, university ln, S College, Crim, baldwin, Troup, Scott Hamilton, Mercer | 2019-01-01 | FIELDSHEET | HTML Link |
Suburban Gas - Brim & Miller Gas line extension | FS-12 | New gas line extension Brim & Miller | 2019-11-18 | FIELDSHEET | HTML Link |
EAST EVERS | FS-13 | 2019-08-01 | FIELDSHEET | HTML Link | |
Main & Wooster Utility Projects | Not Filed | FIELDSHEET | HTML Link | ||
MAIN STREET AND WOOSTER | M3-11 | 2018-08-16 | FIELDSHEET | HTML Link | |
PHEASANT FARMS SUBDIVISION PLAT 8 | M3-12 | 2017-11-11 | FIELDSHEET | HTML Link | |
SOUTH MAPLE | FS-14 | AS-Builts by Dustin | 2021-02-02 | FIELDSHEET | HTML Link |
I-75 PLAN | A-9-477-85 | MISCELLANEOUS | HTML Link | ||
INDUSTRIAL PROPERTIES SANITARY SEWER | C-6-44-65 | 1965-07-17 | MISCELLANEOUS | HTML Link | |
INDUSTRIAL PROPERTIES SANITARY SEWER | T-5-4-7 | 1965-07-17 | MISCELLANEOUS | HTML Link | |
KROGER SIGNALIZATION | A-11-48 | 1995 | 1995-02-17 | MISCELLANEOUS | HTML Link |
MAUSOLEUM | T-13-9 | MISCELLANEOUS | HTML Link | ||
MERCER ROAD SOIL PROFILES | T-7-3-2 | 1972-09-17 | MISCELLANEOUS | HTML Link | |
MIDWOOD/FARM BUREAU WATERLINE | A-7-340-74 | 1974-10-21 | MISCELLANEOUS | HTML Link | |
OAK GROVE CEMETERY SECTION E & EE | T-13-24 | 1989-09-01 | MISCELLANEOUS | HTML Link | |
OAK GROVE CEMETERY E & EE REPLAT | T-13-23 | 1989-10-18 | MISCELLANEOUS | HTML Link | |
OAK GROVE CEMETERY STORM IMPROVEMENT | T-6-3-4 | MISCELLANEOUS | HTML Link | ||
ORIGINAL WWTP SANITARY/STORM SEWER | T-6-1-5 | MISCELLANEOUS | HTML Link | ||
PLAIN TOWNSHIP DITCH NO. 2180 | A-10-423-60 | 1960-01-01 | MISCELLANEOUS | HTML Link | |
POE ROAD SOIL PROFILE | T-7-1-2 | 1972-05-01 | MISCELLANEOUS | HTML Link | |
POLE YARD | T-13-3 | 1990-09-14 | MISCELLANEOUS | HTML Link | |
PORTAGE WATER DISTRIBUTION | T-6-3-5 | 1975-05-22 | MISCELLANEOUS | HTML Link | |
PORTAGE WATER SUPPLY | A-7-50-75 | 1975-05-17 | MISCELLANEOUS | HTML Link | |
PUMPING STATION & SANITARY DISTRICT 3 | C-6-77-65 | 1965-06-10 | MISCELLANEOUS | HTML Link | |
REST STOP WATERLINES (I-75) | C-7-52-74 | 1973-07-09 | MISCELLANEOUS | HTML Link | |
SANITARY/STORM SEWER MAP | A-5-62-67 | 1967-01-01 | MISCELLANEOUS | HTML Link | |
SCHOOL CROSSINGS | T-9-4-6 | MISCELLANEOUS | HTML Link | ||
SCHWAB DITCH CROSSING | T-3-1-6 | 1971-05-22 | MISCELLANEOUS | HTML Link | |
SCHWAB DITCH IMPROVEMENTS | C-7-57-71 | 1971-02-09 | MISCELLANEOUS | HTML Link | |
SOLID WASTE COLLECTION MAP | T-6-1-1 | 1989-02-26 | MISCELLANEOUS | HTML Link | |
TONTOGANY SEWER LINES | A-7-336-00 | MISCELLANEOUS | HTML Link | ||
URSCHELS WATER MAIN | A-4-431-72 | HALL-TOLEDO CORPORATION | 1972-03-22 | MISCELLANEOUS | HTML Link |
UTILITY CONDUIT @ I-75 & STATE ROUTE 6 | C-7-140-65 | 1965-11-23 | MISCELLANEOUS | HTML Link | |