Project Name | File Number | Table | Project Date | Comments | ||
---|---|---|---|---|---|---|
Files (1) | THURSTIN AVENUE | A-12-35 | STREETS | 1/1/1997 | UNIVERSITY WALK RIDGE | |
|
||||||
Files (3) | POE ROAD SOIL PROFILE | T-7-1-2 | MISCELLANEOUS | 5/1/1972 | ||
|
||||||
Files (38) | EAST POE, NORTH COLLEGE INTERESECTION IMPROVEMENTS | AB-C9 | ASBUILT | 2/15/2002 | AS-BUILT | |
|
||||||
Files (1) | WOOD-BRIDGE PARCEL 9 | T-12-4-73 | SURVEYS | 12/23/1997 | ||
|
||||||
Files | Kellogg Road Tontogany Water Backflow Preventer | M5-103 | ASBUILT | 9/23/2024 | ||
|
||||||
Files (40) | HASKINS ROAD | A-8-500-51 | STREETS | 20" FROM PLANT | ||
|
||||||
Files | ODOT SR 64 Plans | WOO-064-10.14-2012 | SURVEYS | 1/1/2012 | Plans are from ODOT 2012 | |
|
||||||
Files (5) | COTTAGE INN PIZZA | T-15-43 | SITEPLANS | 10/26/2005 | ||
|
||||||
Files (1) | WOOD COUNTY YARD | T-12-3 | PLATS | 3/3/1961 | ||
|
||||||
Files (1) | UNIVERSITY HEIGHTS ADDITION | T-12-3 | PLATS | 3/1/1964 | ||
|
||||||
Files (13) | SCOTT BOULEVARD | T-13-1 | STREETS | 1/1/1990 | BRIGHAM TO EAST | |
|
||||||
Files (7) | 1580 Saint George Circle | M5-44 | PROJECTS | 6/18/2018 | ||
|
||||||
Files (3) | CENTAUR | A-11-53 | SITEPLANS | 6/9/1995 | WOOD-BRIDGE | |
|
||||||
Files (6) | MURPHY OIL USA | AB-G8 | ASBUILT | 10/12/2004 | AS-BUILT | |
|
||||||
Files (4) | ABSORBENT WEB ENGINEERING | A-12-20 | SITEPLANS | 1/1/1998 | ||
|
||||||
Files (2) | SNOOK BUSINESS PARK PLAT 2 | T-12-3 | PLATS | 4/26/2002 | COHO SUBDIVISION VICTORY LANE | |
|
||||||
Files (9) | DUNBRIDGE ELECTRIC OMEGA JV5 BACKUP | N/A | SITEPLANS | 8/23/1991 | ||
|
||||||
Files (1) | FIRST FEDERAL SAVINGS | A-9-483-86 | SITEPLANS | 11/20/1985 | ||
|
||||||
Files (15) | TIMBER RIDGE VILLAS PLAT 1 | T-16-47 | SUBDIVISIONS | 11/5/2004 | ||
|
||||||
Files (10) | SUBSTATION 2 | ED-053 | ELECTRIC | 8/14/1997 | POE | |
|
||||||