gis.bgohio.org - /TIFF/Electric/
[To Parent Directory]
1/8/2020 5:22 PM <dir> 12KV SYSTEM MAP
1/8/2020 5:22 PM <dir> 69 kv one line(2)
1/8/2020 5:23 PM <dir> 69KV LINE ROUTE 6 I75
1/8/2020 5:24 PM <dir> 69KV TO SOUTHEAST CONTAINER
1/8/2020 5:24 PM <dir> AMP-OHIO
1/8/2020 5:28 PM <dir> BG Haskins 138 Kv Interconnect
1/8/2020 5:29 PM <dir> BGSU CAMPUS GENERATOR MAP
1/8/2020 5:33 PM <dir> BGSU DISTRIBUTION SYSTEM CONVERSION
1/8/2020 5:36 PM <dir> BGSU DISTRIBUTION SYSTEM CONVERSION PHASE II
1/8/2020 5:39 PM <dir> BGSU DISTRIBUTION SYSTEM CONVERSION PHASE II RECORD
1/8/2020 5:39 PM <dir> BGSU ELECTRIC PLAN
1/8/2020 5:39 PM <dir> BGSU TECHNOLOGY INFRASTRUCTURE PROJECT
1/8/2020 5:40 PM <dir> Bishop Road
1/8/2020 5:40 PM <dir> Bishop to Mitchell
1/8/2020 5:40 PM <dir> Bowling Green Road
1/8/2020 5:41 PM <dir> BREAKER FAILURES
1/8/2020 5:41 PM <dir> CENTER BREAK SWITCH
1/8/2020 5:49 PM <dir> CENTRAL ELECTRIC DRAWINGS
1/8/2020 5:49 PM <dir> CIRCUIT BREAKER 6845
1/8/2020 5:50 PM <dir> CIRCUIT BREAKER 6848
1/8/2020 5:54 PM <dir> Downtown Business District Revitalization - As Built Electric
9/3/2020 11:08 PM <dir> DUNBRIDGE RD SPILL COINTAINMENT
1/8/2020 5:55 PM <dir> DUNBRIDGE ROAD SUBSTATION
1/8/2020 5:55 PM <dir> DUNBRIDGE ROAD SUBSTATION 2
1/8/2020 5:56 PM <dir> ELECTRICAL CONSTRUCTION
1/8/2020 5:56 PM <dir> FINAL ASSEMBLY
1/8/2020 5:56 PM <dir> Gorrell Road
1/8/2020 5:56 PM <dir> Gypsy Lane Road West
1/8/2020 5:57 PM <dir> Kellogg Road
1/8/2020 5:57 PM <dir> Liberty Hi Road
1/8/2020 5:58 PM <dir> Main Street North
1/8/2020 5:59 PM <dir> MAJOR EQUIPMENT BID
1/8/2020 5:59 PM <dir> Mercer Road
1/8/2020 5:59 PM <dir> MODEL A12B
1/8/2020 6:00 PM <dir> New folder
1/8/2020 6:03 PM <dir> NORTH MAIN 2010
10/30/2024 10:35 AM <dir> NORTH MAIN STREET ELECTRIC UTILITY RELOCATION 2010
1/8/2020 6:06 PM <dir> OMEGA JV5 BACKUP GENERATION
1/8/2020 6:09 PM <dir> OMEGA JV5 BACKUP GENERATION AS BUILTS
1/8/2020 6:10 PM <dir> PEAKER PROJECT
3/3/2021 2:23 AM <dir> PG and E DISPERSED GENERATING
3/3/2021 2:24 AM <dir> PG and E DISPERSED GENERATING2
3/3/2021 2:25 AM <dir> PG and E DISPERSED GENERATING3
3/3/2021 2:26 AM <dir> PG and E DISPERSED GENERATING4
3/3/2021 2:27 AM <dir> PG and E GPP
1/8/2020 6:11 PM <dir> PG&E DISPERSED GENERATING
1/8/2020 6:12 PM <dir> PG&E DISPERSED GENERATING2
1/8/2020 6:13 PM <dir> PG&E DISPERSED GENERATING3
1/8/2020 6:13 PM <dir> PG&E DISPERSED GENERATING4
1/8/2020 6:13 PM <dir> PG&E GPP
1/8/2020 6:14 PM <dir> POE ROAD SUBSTATION
1/8/2020 6:14 PM <dir> Poe Road West
1/8/2020 6:14 PM <dir> PT DRAWINGS
1/30/2020 12:00 AM <dir> PUBLIC_WORKS
1/8/2020 6:14 PM <dir> RMVAC CONNECTION DIAGRAM
1/8/2020 6:14 PM <dir> RMVAC CONNECTION DIAGRAM(2)
1/8/2020 6:14 PM <dir> S&C SERIES 2000
3/3/2021 2:27 AM <dir> S-C SERIES 2000
1/8/2020 6:15 PM <dir> SFT Diagrams
1/8/2020 6:15 PM <dir> SHOP DRAWINGS
1/8/2020 6:16 PM <dir> SIEMENS SCHEMATICS
1/6/2020 2:59 PM <dir> SOLAR SITE PACK 1
1/6/2020 3:09 PM <dir> SOLAR SITE PACK 2
1/6/2020 3:15 PM <dir> SOLAR SITE PACK 3
1/8/2020 6:18 PM <dir> SOUTHEASTERN CONTAINER
1/8/2020 6:19 PM <dir> SOUTHEASTERN CONTAINER ARCHITECTURAL
1/8/2020 6:19 PM <dir> SOUTHEASTERN CONTAINER EXISTING CONDITIONS
1/8/2020 6:20 PM <dir> SOUTHEASTERN CONTAINER RECORD DRAWINGS
1/8/2020 6:21 PM <dir> SOUTHEASTERN CONTAINER SCHEMATIC
1/8/2020 6:23 PM <dir> SUBSTATION 1 TRANSFORMERS
1/8/2020 6:25 PM <dir> SUBSTATION 2
3/3/2021 2:28 AM <dir> SUBSTATION 2 - 3
1/8/2020 6:25 PM <dir> SUBSTATION 2 ANNUNCIATOR
1/8/2020 6:25 PM <dir> SUBSTATION 2 CONTROL HOUSE EQUIPMENT
1/8/2020 6:27 PM <dir> SUBSTATION 2&3
1/8/2020 6:27 PM <dir> SUBSTATION 2(2)
1/8/2020 6:28 PM <dir> SUBSTATION 2(3)
1/8/2020 6:29 PM <dir> SUBSTATION 2(4)
1/8/2020 6:30 PM <dir> SUBSTATION 3
1/8/2020 6:32 PM <dir> SUBSTATION 3 BREAKER RELAY PANEL
1/8/2020 6:32 PM <dir> SUBSTATION 3 WIRING DETAILS
1/8/2020 6:34 PM <dir> SUBSTATION 3 WIRING DETAILS(2)
1/8/2020 6:36 PM <dir> SUBSTATION 3(2)
1/8/2020 6:38 PM <dir> SUBSTATION 4
1/8/2020 6:39 PM <dir> SUBSTATION 4 RELAY PANEL
1/8/2020 6:41 PM <dir> SUBSTATION 4 SITE PLAN
1/8/2020 6:42 PM <dir> SUBSTATION 4&5 REPAIRS
1/8/2020 6:45 PM <dir> SUBSTATION 4(2)
1/8/2020 6:46 PM <dir> SUBSTATION 4(3)
1/8/2020 6:48 PM <dir> SUBSTATION 4(4)
1/8/2020 6:48 PM <dir> SUBSTATION 4(5)
1/8/2020 6:48 PM <dir> SUBSTATION 4(6)
1/8/2020 6:49 PM <dir> SUBSTATION 4(7)
1/8/2020 6:51 PM <dir> SUBSTATION 4(8)
1/8/2020 6:52 PM <dir> SUBSTATION 4(9)
3/3/2021 2:30 AM <dir> SUBSTATION 4-5 REPAIRS
1/8/2020 7:01 PM <dir> SUBSTATION 5
1/8/2020 7:02 PM <dir> SUBSTATION 5 AND 7
1/8/2020 7:07 PM <dir> SUBSTATION 6
1/8/2020 7:10 PM <dir> SUBSTATION 7
1/8/2020 7:11 PM <dir> SUBSTATION 7 DIAGRAM
1/8/2020 7:12 PM <dir> SUBSTATION 7 PANEL
1/8/2020 7:14 PM <dir> SUBSTATION 7(2)
8/31/2020 11:29 PM <dir> SUBSTATION NO 4 TRANSFORMER NO 8 REPLACEMENT
10/30/2024 10:35 AM <dir> SUBSTATION NO 4 TRANSFORMER REPLACEMENT 2017
1/8/2020 7:16 PM <dir> UNDERGROUND DUCT SYSTEMS AND INSTALL OF 69KV AND 12.47KV CIRCUITS
1/8/2020 7:18 PM <dir> WASTEWATER FACILITY SCHEMATICS
1/8/2020 7:18 PM <dir> WASTEWATER TREATMENT PLANT
1/8/2020 7:18 PM <dir> WOODBRIDGE ELECTRIC